How to compare renovation quotes line by line

Put competing renovation quotes on the same scope, quantities and pricing basis. This bathroom example shows how to spot a missing item before comparing totals.

Example illustration

Worked example: a 600 yuan saving turns into a 300 yuan premium

Two contractors quote for the same bathroom. Quote A is 6800 yuan and includes demolition, debris removal, waterproofing and tile installation. Quote B is 6200 yuan and includes the same work except debris removal. Assume the other quantities and tax treatment match. If B confirms 900 yuan for removal, its comparable price becomes 6200 + 900 = 7100 yuan, which is 300 yuan higher than A.

Keep the original and adjusted totals side by side. Record the 900 yuan as an allowance until the contractor confirms it in writing. An allowance makes the comparison useful while making it clear which numbers still need a decision.

A line-by-line comparison you can review before hiring

  1. Start with a common list of work

    List each room and task separately, such as bathroom demolition, carrying debris out of the building and installing the waterproofing membrane. Keep the contractor’s original description next to your shared labels, which makes it easier to trace any difference.

    If a quote contains one lump sum for a bathroom, ask what it covers before trying to split the amount across rows. Leave the individual prices blank if the contractor only sells the work as a package.

  2. Match the units and quantities

    Compare the same service with the same measurement basis. For floor tile installation, for instance, ask which areas are included in the square meter count and how openings or recesses are handled. Convert linear and area rates only when the relevant height and scope are known.

    Mark estimates that can change after final measurement. Agree on the quantities used for the comparison and check each contractor’s rate if the final quantity increases.

  3. Distinguish included, excluded and free work

    When a task is included in a package, name the package instead of assigning it an invented price. Treat an empty cell or an extra-charge label as unresolved. Reserve zero for work the contractor has confirmed is provided without a separate charge.

    Check protection, stairs or lift handling, disposal and final cleanup. These details can be hard to renegotiate after the site is open.

  4. Compare what will actually be installed

    For waterproofing, compare the materials, wall upturns, coat count and whether a flood test is included. For tile installation, check whether the owner supplies tiles and whether adhesive, grout, cuts and finishes are included. Similar descriptions can cover different deliverables.

  5. Compare changes and settlement as well as totals

    Ask how changes are priced and approved before work starts. Then check whether payment is based on measured quantities or a fixed price for a defined scope. If quotes use different tax or discount treatment, record how each total was calculated before comparing them.

  6. Keep an auditable copy

    Attach the room measurements, relevant photos and written answers to the comparison. Include agreed scope, quantities, rates and acceptance checks in the final quote or contract attachment. Keep the comparison sheet as a reference for checking changes later.